Building Permit

Note: Land Demarcation Certificate to be obtained before starting any activity at site

Final Building Permit:

Documents Required

Fees

  • Normal Submission: AED 1.00  per ft2 on Total Built-Up-Area (one time fee) . The final Building permit fees will be calculated after deducing the fees which were paid previously for the Interim & Preliminary Permit except for Mobilization and Excavation Permits.
  • For Industrial plot: the above fees not to exceed AED 250,000
  • Fast Track Submission: AED 10,000 + normal submission fees
An additional fees of AED 10 as “Knowledge Dirham” and AED 10 as “Innovation Dirham” is applicable per transaction.

Duration

  • Normal Submission: 4 working days
  • Fast Track Submission: 2 working days
> >  

Mobilization Permit:

((Preliminary Design Approval should be obtained before applying for this permit (refer Form No. ZA-DC-F-03))

Documents Required

  1. Building Permit Application (In case of applying through customer service center)
  2. Appointment letter by the Owner to Consultant and Contractor , signed by Owner and Consultant
  3. Layout of proposed hoarding, signboard, site offices including color, material etc.
  4. Undertaking Letter (applicable for Mobilization only)

Fees

  • Mobilization Permit: AED 5,000 
  • Mobilization for Villas: AED 1,000 per Villa
  • Fast Track: AED 10,000
An additional fees of AED 10 as “Knowledge Dirham” and AED 10 as “Innovation Dirham” is applicable per transaction.

Duration

  • Normal Submission: 4 working days
  • Fast Track Submission: 2 working days

 

Excavation Permit:

((Preliminary Design Approval should be obtained before applying for this permit (refer Form No. ZA-DC-F-03))

Documents Required

  1. Building Permit Application (In case of applying through customer service center)
  2. Geotechnical design calculations (slope stability) for open Excavation
  3.  Drawings with Consultant and Contractor logo and stamp (soft copy)
  4. NOC from DM - Coastal Zone and Waterways Management section (as per decree #(22) 2001) (if applicable)
  5. NOC from RTA for excavation outside plot limit (roadside)
  6. Excavation Design Review Checklist
  7. NOC from Neighbor/Plot Owner (if Excavation in Neighbor plot)
  8. Peer Review Report (as per structural guidelines ) (soft copy)
  9. All documents mentioned in the Mobilization Permit section (if not submitted)

Fees

  • Excavation Permit: AED 5,000
  • Excavation Permit for Villas: AED 1,000 per Villa
  • Fast Track: AED 10,000
An additional fees of AED 10 as “Knowledge Dirham” and AED 10 as “Innovation Dirham” is applicable per transaction

Duration

  • Normal Submission: 5 working days
  • Fast Track Submission: 3 working days

 

Shoring Permit:

((Preliminary Design Approval should be obtained before applying for this permit (refer Form No. ZA-DC-F-03))

Documents Required

  1. Building Permit Application (In case of applying through customer service center)
  2. Geotechnical design calculations
  3. Drawings with Consultant and Contractor logo and stamp (soft copy)
  4. NOC from DM - Coastal Zone & Waterways Management section (as per decree# (22) 2001) (if applicable)
  5. NOC from RTA (if Shoring and anchors outside the plot limit (roadside))
  6. Shoring Design Review Checklist
  7. NOC from neighbor/plot owner (if Excavation and anchors in neighbor plot)
  8. Peer Review Report (as per structural guidelines ) (soft copy)
  9. All documents mentioned in the Mobilization Permit section (if not submitted)

Fees

  • Shoring Permit: AED 0.05 on Total Built-Up-Area (ft2)
  • Fast Track: AED 10,000
  • An additional fees of AED 10 as “Knowledge Dirham” and AED 10 as “Innovation Dirham” is applicable per transaction

Duration

  • Normal Submission: 5 working days
  • Fast Track Submission: 3 working days

 

Piling Permit: 

((Preliminary Design Approval should be obtained before applying for this permit (refer Form No. ZA-DC-F-03))

Documents Required

  1. Building Permit Application (In case of applying through customer service center)
  2. Geotechnical design calculations
  3.  Drawings with Consultant and Contractor logo and stamp (soft copy)
  4. Piling Design Review Checklist
  5. Peer Review Report (as per structural guidelines ) (soft copy)
  6. All documents mentioned in the Mobilization Permit section (if not submitted)
Note: Shoring and Piling permit submission shall be submitted separately

Fees

  • Piling Permit: AED 0.1 on Total Built-Up-Area (ft2) +
  • Fast Track: AED 10,000
  • An additional fees of AED 10 as “Knowledge Dirham” and AED 10 as “Innovation Dirham” is applicable per transaction

Duration

  • Normal Submission: 10 working days
  • Fast Track Submission: 5 working days

 

Sub-structure Permit:

Sub-Structure Design Approval should be obtained before applying for this permit (refer Form No. ZA-DC-F-04))

Documents Required

  1. Building Permit Application (In case of applying through customer service center)
  2. All documents mentioned in the Mobilization Permit section (if not submitted)

Fees

  • Fast Truck Submission : AED 10,000
  • Normal Submission: AED 0.2 per ft2 on Total Built-Up-Area (one-time fee) + AED 20,000
An additional fees of AED 10 as “Knowledge Dirham” and AED 10 as “Innovation Dirham” is applicable per transaction

Duration

  • Normal Submission: 4 Working Days
  • Fast track Submission: 2 Working Days

 

Important Notes: Any legal documents consisting of more than one page must be sealed. The Power of Attorney shall clearly set out the delegated powers and needs to be accompanied with a valid passport copy of the Attorney-in-fact when presented to the Authority. The Authority reserves the right to request for any additional documents or attestations by the UAE embassy or other embassies or government entities it may require, as and when necessary. Board Resolution and/or Power of Attorney is required from the Manager: this should state the Manager's full name, nationality and passport number. The legal documents must be in English and /or Arabic. Documents prepared in any other language other than English or Arabic must be legally and officially translated.