Temporary Construction Permit

Documents Required

      • Temporary Construction Permit request (In case of applying through customer service center)
      • Design drawings stamped by Consultant (as per Circular no. 229)
      • NOC from relevant local Authorities (if applicable)
      • Soil report (if applicable)
      • Copy of structural calculations and models (if applicable)
      • NOC from Master Developer (if applicable)
      • Copy of Consultant’s trade license (if applicable)
    • Note: Any damages/obstruction to existing services should be re-instated as original 
  • Renewal of Temporary Construction Permit:

    • Temporary Construction Permit request (In case of applying through customer service center)

    • Fees

    • For Temporary Construction Permit: AED 5,000
    • For Renewal of Temporary Construction Permit: AED 5,000
An additional fees of AED 10 as “Knowledge Dirham” and AED 10 as “Innovation Dirham” is applicable per transaction. >

Duration:

    •  4 working days

 

Important Notes: Any legal documents consisting of more than one page must be sealed. The Power of Attorney shall clearly set out the delegated powers and needs to be accompanied with a valid passport copy of the Attorney-in-fact when presented to the Authority. The Authority reserves the right to request for any additional documents or attestations by the UAE embassy or other embassies or government entities it may require, as and when necessary. Board Resolution and/or Power of Attorney is required from the Manager: this should state the Manager's full name, nationality and passport number. The legal documents must be in English and /or Arabic. Documents prepared in any other language other than English or Arabic must be legally and officially translated.