Requester |
Plot Owner, Old Consultant/Contractor
|
Service Deliverables |
Confirmation Email
|
Service Request Channels |
Online
|
Service Hours |
Online: 24/7 |
Estimated Time to Deliver |
- Request with NOC from the previous Contractor/ Consultant: 2 Working Days
- Request with undertaking letter from the Owner: 10 Working Days
|
Service Fees |
- Request with NOC from the previous Contractor/ Consultant: AED 500
- Request with undertaking letter from the Owner (for Building projects only): AED 5,000
- Request with undertaking letter from the Owner (for all project types except Building): AED, 2,000
An additional fee of AED 10 as “Knowledge Dirham” and AED 10 as “Innovation Dirham” is applicable per transaction
|
Required Documents |
Consultant Replacement- New Consultant Appointment Letter by the owner (In case of applying online)
Contractor Replacement- NOC from old contractor (In case of applying online)
- Appointment and Acceptance Letter to be signed and stamped by owner, consultant and new contractor (In case of applying online)
Consultant and Contractor Replacement- Appointment and Acceptance Letter to be signed and stamped by owner, consultant and new contractor (In case of applying online)
- NOC from old consultant and contractor (In case of applying online)
|
Notes |
- Replacing Contractor requested to apply for Re-Demarcation Certificate (if applicable)
- If the NOC from the previous Consultant is not available, undertaking Letter (Template No. "ZA-DC-T-109") to be signed by owner.
- If the NOC from the previous Building Contractor is not available, undertaking Letter (Template No. "ZA-DC-T-110") to be signed by owner and a report of site condition to be submitted.
- If the NOC from the previous Fit-out Contractor is not available, undertaking Letter (Template No. "ZA-DC-T-111") to be signed by owner and a report of site condition to be submitted.
- The process duration for any request without NOC from previous Consultant/Contractor is 10 working days.
|