Overview

Service Name

Piling Permit

Piling Permit

DescriptionThis service allows the customer to obtain a permit to start the piling works to transfer the load of the structure to a required depth in deep foundations.

Details

RequesterContractor
Service DeliverablesPiling Permit
Service Request ChannelsOnline
Service HoursOnline: 24/7
Estimated Time to Deliver3 Working Days
Service Fees
  • Piling Permit: AED 0.1 on Total Built-Up-Area (ft2)
  • Renewal of Piling Permit: (AED 0.03 per ft2 on Total Built-Up-Area) x (No. of months requested for renewal) (Maximum AED 6,000 per month)

Paid Fee will be deducted in Final Building Permit

An additional fee of AED 10 as “Knowledge Dirham” and AED 10 as “Innovation Dirham” is applicable per transaction
Required Documents
Notes
  • The approved permit is valid for 4 years
  • Preliminary Design Approval should be obtained before applying for this permit (refer Form No. ZA-DC-F-03)