Requester | Consultant |
Service Deliverables | Approval on the design |
Service Request Channels | - Online
- Customer Service Center at Dubai Studio City - Commercial Building 1 - Ground Floor
|
Service Hours | - Online: 24/7
- Customer Service Centre:
Monday to Thursday from 7:30 am to 2:30 pm. Friday from 7:30 am to 12 pm. |
Estimated Time to Deliver | 5 Working Days |
Service Fees | - New Submission: AED 0.1 per ft2 on total Built up area.
Minimum AED 200 & Maximum AED 50,000 Paid Fee will be deducted in Final Building Permit - Renewal: AED 2,000 per year
(Maximum Renewal: 2 years) An additional fee of AED 10 as “Knowledge Dirham” and AED 10 as “Innovation Dirham” is applicable per transaction |
Required Documents | - Final Design Approval Request(In case of applying through customer service center)
- Architectural,Structural andMechanical Design drawings (as perCircular no. 400)
- Consultant appointment letter from owner
- NOC from department of Civil Aviation (if applicable)
- NOC and stamped drawings from Ministry of AWQAAF & religious affairs (for Masjid purpose)
- DM Environmental Authority approval for swimming pools, industrial use (industrial / manufacturing), and gray water treatment plant (if applicable)
- Approved vehicle access and traffic impact study from RTA
- Gate Level confirmation from RTA
- RC Structural Design Approval Checklist
- Structural calculations and structural model (soft copy)
- Peer review report (as per Structural Guidelines) (if applicable)
- District cooling service provider NOC (if applicable)
- Valid NOC from DEWA (Electricity & Water)
- Civil Defense final design approval
- NOC from Telecom Operator (Du/Etisalat)
- Sewerage Connection Confirmation from Master Developer/ infrastructure consultant/DM- Drainage Department)
- Mechanical Design Review Checklist
|
Notes | - Site Plan must be valid at the time of submission
- No documents are required for design renewal application
- Soil Investigation Report (Form No. ZA-DC-F-07B) must be approved by DDA before applying for this service.
- The approved design is valid for 1 year
|